Cureton, A.
Andrew Cureton has been a Product Manager for Emerson’s Pervasive Sensing applications for 4 yr and has been its go-to technical expert for the support of hundreds of wireless deployments in North America. His background includes quality engineering, computer networks and data analytics. Mr. Cureton earned a BS degree in industrial engineering from the University of Minnesota.
How to support condition monitoring with wireless instrumentation networks
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Analyzers
/ Boilers
/ Compressors
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Information Systems
/ Loss Prevention
/ Motors
/ Natural Gas
/ People
/ Pumps
/ Reactors
/ Rotating Equipment
/ Safety
When <i>Wireless</i>HART first hit the market in 2008, most of the native devices using it were process measurement instruments.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction