Omatick, T.
Todd Omatick is the New Product Introduction Manager in Elliott’s Product and Technology Development group. He has been with Elliott for 24 yr, holding multiple positions focused on LNG. He holds BS and MS degrees in electrical engineering from the University of Pittsburgh.
Advanced compressor control and monitoring systems
Modern advanced control and monitoring systems for centrifugal compressors support compression plant operation at the highest possible efficiency, availability and reliability.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clariant's FAMAX™ catalysts deliver outstanding performance at two Yihua formaldehyde plants in China 5/27
- Aramco and Emerson collaborate on strategic corrosion R&D 5/27
- TotalEnergies extends fuel price cap in France through June 5/27
- MOL says repairing petrochemical plant damaged in explosion could take several months 5/27
- China allows fresh urea exports amid Iran war-fueled fertilizer crisis 5/27
- India ethanol push drives big rise in land farmed to make fuel 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

