Tan, P. C.
Pui Chew Tan is Manager, Instrumentation and Control, and has been working with Dialog E&C Sdn Bhd for 9 yr. Prior to that, he had several roles as an electrical and instrument maintenance engineer in a power station, a DCS and PLC programmer, and as an application engineer with General Electric. Tan earned a degree in electrical engineering from Melbourne University.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe fuels China’s push for sustainable aviation fuel: Selected as technology provider for major project 1/23
- Europe set for record LNG imports in 2026 1/23
- Plug Power completes installation of 100-MW GenEco electrolyzer units at Galp’s Sines refinery 1/23
- Reju announces site selection for first U.S. industrial-sized facility regeneration hub 1/23
- Engineering a low-cost alternative catalyst for producing sustainable petrochemicals 1/23
- New report identifies methanol-to-jet as a key accelerator of the next wave of sustainable aviation fuel 1/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction