Lemmers, S. P. B.
Sander P. B. Lemmers is Head of the Project Development Department in Dialog E&C Sdn Bhd. He has more than 26 yr of experience in both the technical and business facets of the global engineering, procurement and construction industry. Lemmers is involved in the development of small- and large-scale LNG and other liquefied gas and hydrocarbon terminals in Malaysia and Southeast Asia. He holds a BSc degree and an MSc degree in industrial engineering and management, and an MSc degree in chemical engineering, from Twente University for Technical and Social Sciences in Enschede, the Netherlands.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Inovyn agrees to sell its Italian chlor-alkali business to Esseco Industrial 4/21
- LOTTE Chemical to merge into integrated corporation after spinning off Daesan plant 4/21
- Petronor and H2SITE partner to pioneer high-purity hydrogen production in refining through advanced membrane technology 4/21
- Emerson accelerates edge ecosystem for real-time enterprise operations intelligence 4/21
- Tracerco launches DrumVision™ to deliver real-time process visibility in delayed coking and demanding interface measurement applications 4/21
- IMI signs global framework extension with Solvay for the provision of IIoT sensors 4/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

