Lemmers, S. P. B.
Sander P. B. Lemmers is Head of the Project Development Department in Dialog E&C Sdn Bhd. He has more than 26 yr of experience in both the technical and business facets of the global engineering, procurement and construction industry. Lemmers is involved in the development of small- and large-scale LNG and other liquefied gas and hydrocarbon terminals in Malaysia and Southeast Asia. He holds a BSc degree and an MSc degree in industrial engineering and management, and an MSc degree in chemical engineering, from Twente University for Technical and Social Sciences in Enschede, the Netherlands.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

