Aguirre, M.
Maria Aguirre is the General Sales Manager–Latin America for Cowan Dynamics. She has more than 10 yr of expertise in the selection and design of valve automation solutions. Ms. Aguirre earned a master’s degree in engineering from Concordia University in Montreal, Quebec, Canada, and is licensed in Canada as a professional mechanical engineer with the Professional Engineers and Geoscientists of Alberta (APEGA).
Air-to-air pneumatic booster fail-safe system for valves
Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Natural Gas
/ Safety
/ Valves
In pneumatic valve automation systems, it is common to hear the following terms for valve positions: “fail open (FO),” “fail close (FC)” and “fail last (FL)”.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Anton Paar launches Autosorb 3300: An advanced flow chemisorption analysis for catalyst characterization 7/31
- China's MIIT recognizes DODGEN melt crystallization technology for 72% energy reduction in ethylene carbonate purification 7/31
- Lydian secure $43 MM Series A funding to deliver cost-competitive SAF at commercial scale 7/31
- PureField launches 150,000-tpy CCS facility in Kansas (U.S.) 7/31
- ADM to expand North America crush capacity amid strong biofuels demand 7/31
- U.S. refiner Valero says tax credit overhaul, registration hurdles have slowed biofuel imports 7/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

