Aguirre, M.
Maria Aguirre is the General Sales Manager–Latin America for Cowan Dynamics. She has more than 10 yr of expertise in the selection and design of valve automation solutions. Ms. Aguirre earned a master’s degree in engineering from Concordia University in Montreal, Quebec, Canada, and is licensed in Canada as a professional mechanical engineer with the Professional Engineers and Geoscientists of Alberta (APEGA).
Air-to-air pneumatic booster fail-safe system for valves
Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Natural Gas
/ Safety
/ Valves
In pneumatic valve automation systems, it is common to hear the following terms for valve positions: “fail open (FO),” “fail close (FC)” and “fail last (FL)”.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Purem by Eberspaecher develops new direct air capture technology 9/18
- Aker-Nscale JV signs multi-billion dollar AI infrastructure agreement with Microsoft 9/18
- Tracerco spearheads tracer technology in first U.S. carbon capture and storage (CCS) project 9/18
- Russia’s Novatek redirects gas condensate to Novorossiisk after Ust-Luga complex shutdown 9/18
- HyOrc and Start Lda form JV to launch national green methanol platform in Portugal 9/18
- Fatal accident at Mongstad refinery 9/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction