Eskandarlu, A.
a mechanical engineering graduate from Azad University, has been actively involved in the area of rotating and packaged equipment engineering since 2005. Since he joined Chagalesh Consulting Engineers in 2008, he has been engaged in many hydrocarbon processing projects as a machinery lead engineer. He holds a head position in the machinery department of Chagalesh and is also an instructor of pump and compressor courses.
Compare pitot tube pumps with high-speed centrifugal pumps for low-flow applications
When seeking a pump for a low-flow, high-head application, there is a temptation to choose a high-speed (HS) integral gear-driven centrifugal pump because of its advantages over multi-stage centrifugal and other types of pumps.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction