Regueira, V.
Victor Regueira graduated as a Chemical Engineer from the Federal University of Bahia and is finishing his MS degree in industrial engineering. He was an intern at Braskem’s ethylene plant during the development of this work.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TA'ZIZ and Alpha Dhabi Holding agree to $10-B, 2.2-MMtpy of chemicals investments in the UAE 5/6
- Borouge to deliver first batch of cross-linkable polyethylene from new 100,000-tpy plant this quarter 5/6
- LyondellBasell completes sale of select European strategic assessment assets 5/6
- Australia commits $7 B to boost fuel stockpiles, create government reserve 5/6
- Israel to transfer jet fuel to Germany following Hormuz crisis 5/6
- Equinor: Iran war lifts Asia-Pacific interest for Norwegian petroleum products, LNG 5/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

