Bueno, A.
Admar Bueno has worked nearly 10 yr in the petrochemicals and energy sectors. He is a Process Engineer at Braskem’s Camaçari ethylene plant in Brazil, where he oversees pyrolysis furnace performance.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Convertus closes on $135-MM financing for flagship biofuel facility in Ontario, Canada 8/3
- New process turns mixed plastic waste into hydrogen fuel without sorting 8/3
- Opinion: Iran war ushers in oil refining golden era—it won’t last 8/3
- bp completes sale of Gelsenkirchen refinery as overhaul continues 8/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

