Regueira, V.
Victor Regueira graduated as a Chemical Engineer from the Federal University of Bahia and is finishing his MS degree in industrial engineering. He was an intern at Braskem’s ethylene plant during the development of this work.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- KazMunayGas starts building polyethylene plant with Sinopec, SIBUR 4/1
- Blue Tide, Shell Lubricants complete re-refining facility to develop high-performance lubricants 4/1
- Lummus successfully starts up PFAS demo unit to destroy "forever chemicals" 4/1
- Solvay partners with Cavalinho to reduce emissions at Brazilian chemical plant 4/1
- Shell completes Singapore refinery sale to Chandra Asri-Glencore JV 4/1
- Japan's Maruzen Petrochemical to shut ethylene unit in Chiba 4/1
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction