Regueira, V.
Victor Regueira graduated as a Chemical Engineer from the Federal University of Bahia and is finishing his MS degree in industrial engineering. He was an intern at Braskem’s ethylene plant during the development of this work.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction