Regueira, V.
Victor Regueira graduated as a Chemical Engineer from the Federal University of Bahia and is finishing his MS degree in industrial engineering. He was an intern at Braskem’s ethylene plant during the development of this work.
Energy losses from the radiant firebox wall of pyrolysis furnaces
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Loss Prevention
/ Natural Gas
/ Americas
The steam cracking unit is highly energy demanding, requiring high-severity pyrolysis furnaces to break the carbon-carbon bonds, as well as high pressure for the purification of its products.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Thyssenkrupp Nucera abandons U.S. green hydrogen projects no longer deemed feasible 8/14
- China's petrochemical sector set to expand even as losses deepen 8/14
- SIBUR develops new polyethylene grade for FMCG packaging 8/13
- L&T Energy GreenTech partners with Japan’s ITOCHU for 300,000-tpy green ammonia project 8/13
- VINCI wins major contract for innovative biofuels plant in Spain 8/13
- Orlen Unipetrol to shut ethylene unit at Litvinov plant for several days 8/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction