Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Feature: Guiding a chopper valve application 11/30
- Certification of the recyclability of multilayer films containing polyamide expanded 11/30
- Net-zero chemicals industry initiative relaunches as the Global Impact Coalition 11/30
- Topsoe and Standard Gas sign MoU to collaborate on UK-based renewable natural gas and methanol project 11/30
- Virent and Johnson Matthey's SAF breakthrough powers Virgin Atlantic's historic 100% sustainable transatlantic flight 11/29
- EY partners with Aspen Technology to enhance clients’ sustainability, streamline manufacturing, and modernize utility grids 11/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction