Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant technology to transform 8,000 tpy of CO₂ to synthetic fuels and waxes 6/3
- Lummus and InnoVent Renewables sign MoU for tire pyrolysis technology 6/3
- Marubeni signs a long-term offtake agreement for green ammonia produced in Inner Mongolia, China 6/3
- Braskem to commercially implement Ardent’s Olefin Separation technology 6/3
- BASF, Yuntianhua successfully verify/register GHG emissions reductions from the use of stabilized urea fertilizer 6/3
- Both crude units at bp Rotterdam oil refinery are offline 6/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction