Price, B. C.
Reduce air emissions from natural gas vaporization units
New revaporizing method mitigates air pollutant releases while maintaining process efficiency
Developing mid-scale LNG projects from the contractor's perspective
Modular liquefaction methods reduce construction and operating costs for smaller reserve developments
Optimize energy consumption for LNG vaporization
New methods maximize heat transfer to regasify natural gas with minimum environmental impacts
Achieving world-class operating performance
Apply appropriate reliability and operating improvement techniques in an integrated process to match plant capabilities
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LanzaJet, ATOBA Energy sign MoU to expand access to SAF market 6/4
- U.S. renewable diesel production and biodiesel production declined in 1Q 2025 6/4
- Chart Industries and Flowserve combined to form $19-B enterprise 6/4
- Airlines must ink long-term deals on greener fuels to boost volumes: Bayer exec 6/4
- EIA: U.S. crude stockpiles fall, fuel builds as refiners hike output 6/4
- PetroChina to close last unit of biggest north China refinery end-June 6/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction