Price, B. C.
Reduce air emissions from natural gas vaporization units
New revaporizing method mitigates air pollutant releases while maintaining process efficiency
Developing mid-scale LNG projects from the contractor's perspective
Modular liquefaction methods reduce construction and operating costs for smaller reserve developments
Optimize energy consumption for LNG vaporization
New methods maximize heat transfer to regasify natural gas with minimum environmental impacts
Achieving world-class operating performance
Apply appropriate reliability and operating improvement techniques in an integrated process to match plant capabilities
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Braskem Siam partners with Mitr Phol Bio Fuel to use ethanol to produce bio-ethylene/polyethylene 3/21
- Wison Engineering signs FEED contract with WasteFuel for Ankara Green Methanol project in Turkey 3/21
- U.S. slaps Iran-related sanctions on oil tankers, China 'teapot' refinery 3/21
- Regulations needed to spur airlines to use SAF, Japan oil refiners group head says 3/21
- Russia replaces UAE as the top naphtha supplier to India in 2024–25 3/21
- Asia's sour crude demand to rebound on completed regional refinery maintenance and upgrades 3/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction