Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TA'ZIZ and Alpha Dhabi Holding agree to $10-B, 2.2-MMtpy of chemicals investments in the UAE 5/6
- Borouge to deliver first batch of cross-linkable polyethylene from new 100,000-tpy plant this quarter 5/6
- LyondellBasell completes sale of select European strategic assessment assets 5/6
- Australia commits $7 B to boost fuel stockpiles, create government reserve 5/6
- Israel to transfer jet fuel to Germany following Hormuz crisis 5/6
- Equinor: Iran war lifts Asia-Pacific interest for Norwegian petroleum products, LNG 5/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

