Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction