Köster, R.
Rainer Köster is Manager of Asset Development at BAYERNOIL, and has been working for the company and BP since 1988. He holds a degree in chemical engineering from the University of Hannover.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Petroecuador declares emergency at Ecuador's biggest refinery after fire damages 5/30
- U.S. administration considers plan to clear record backlog of small refinery biofuel waivers 5/30
- Sinopec sets up $690-MM hydrogen-energy-focused venture capital fund 5/30
- Wartsila bets flexibility key for ethanol power generation in Brazil 5/30
- Lotte Chemical Titan signs contract to buy naphtha from Aramco Trading Singapore 5/30
- India's May diesel exports to Southeast Asia seen at multi-year highs on higher margins 5/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction