Saadat Asgar-zadeh is head of Integrated Refining and Feasibility Studies in the Institute of Petrochemical Processes. She has more than 45 yr of experience in refinery processes. Dr. Asgar-zadeh holds a doctorate in technical sciences and has authored more than 100 scientific papers. She was awarded a certificate of merit from the Azerbaijan National Academy of Science in 2011 and a progress medal in 2013.
Technical considerations for the Heydar Aliyev refinery revamp
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Europe
/ Construction
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Greenhouse Gases
/ Hydrotreating
/ Naphtha
/ Natural Gas
/ Products
/ Pumps
/ Reactors
/ Safety
/ Treating
The following case study describes the early development phases of SOCAR’s ongoing major revamp project at the Heydar Aliyev Refinery (HAR) in Baku, Azerbaijan, and its interface with the associated Azerikimya (AZK) steam cracking complex near Sumgait. References are made to the related SOCAR polymer project in Sumgayit, as well.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
- Lummus expands R&D capabilities to enhance innovation and water and wastewater technologies 4/17
- Niger plans to build diesel refinery and increase supplies to Mali 4/17
- BASF, SABIC, and Linde celebrate the start-up of the world's first large-scale electrically heated steam cracking furnace 4/17
- U.S. crude stocks rise, gasoline, distillate inventories fall 4/17
- Russia's offline primary oil refining capacity revised up for April 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction