Guesneux, S.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Mitsui Chemicals studying use of ethanol to make petrochemicals 5/16
- Lotte Chemical to start operating Indonesia cracker in H2 2025 5/16
- hte, Mitsubishi Chemical partner to screen MMA oxidation catalysts 5/16
- U.S. EPA to rule on backlog of small refinery biofuel exemption requests 5/16
- Some Brazil sugar mills weighing switch to ethanol 5/16
- AFPM honors top refining and petrochemical facilities 5/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction