Musharfy, M.
Mohamed Al Musharfy has more than 13 years of multidisciplinary experience in planning, coordination, business studies and development in the field of refining. He works as the Manager of engineering R&D at the TAKREER Research Centre, and he earned a BS degree in chemical engineering from the United Arab Emirates University.
Simulation for the prevention of hydrates during FCC gas processing
In the last decade, maximizing refinery production of polymer-grade propylene (PGP) has gained importance due to high demand from the petrochemical industry.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

