Musharfy, M.
Mohamed Al Musharfy has more than 13 years of multidisciplinary experience in planning, coordination, business studies and development in the field of refining. He works as the Manager of engineering R&D at the TAKREER Research Centre, and he earned a BS degree in chemical engineering from the United Arab Emirates University.
Simulation for the prevention of hydrates during FCC gas processing
In the last decade, maximizing refinery production of polymer-grade propylene (PGP) has gained importance due to high demand from the petrochemical industry.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Renewable fuels project in Canada begins production 4/19
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction