Technip Energies to perform FEED for gas plant associated with carbon capture in Malaysia
The FEED contract covers the design of an onshore gas plant including the integrated flow assurance of the native CO2 capture, compression and transportation via pipeline up to the offshore wellhead platform where it will be reinjected. The gas coming from the Lang Lebah offshore field will be treated before being sent to the Malaysia LNG complex.
The Lang Lebah OGP2 project is one of the key projects of the
Related News
- Michelin, IFPEN and Axens announce successful progress in BioButterfly™ R&D project to produce biobased butadiene from bioethanol
- RCI, nova-Institut unveil new carbon label for products, intermediates and raw materials
- Methanol Reformer to supply Mitsubishi Gas Chemical with L18 methanol reformer technology


Comments