Technip wins Brazil fertilizer plant engineering deal
Technip was awarded a contract for providing basic and front-end engineering services on Petrobras grassroots fertilizer complex to be located at Uberaba, state of Minas Gerais, Brazil.
The deal was awarded within the framework of a cooperation partnership with Haldor Topsoe, Technip officials said.
The fertilizer complex will comprise a 1,500 tpd ammonia unit based on Haldor Topsoe technology, and the complete utilities and offsites systems necessary for the operation of the complex.
The basic engineering design will be developed by Haldor Topsoe and Technip operating center in Rome, Italy, while Technip operating center in Rio de Janeiro, Brazil, will execute the front end engineering design.
The overall engineering activities are scheduled to be completed within the first half of 2012.
The complex, which is scheduled to be in operation within the second semester of 2015, will contribute to reduce Brazils dependence on ammonia imports, officials said.
Related News
- Michelin, IFPEN and Axens announce successful progress in BioButterfly™ R&D project to produce biobased butadiene from bioethanol
- RCI, nova-Institut unveil new carbon label for products, intermediates and raw materials
- SK Energy secures in-house access to feedstock to create Korea's first vertical integration for waste plastics recycling


Comments