March 2024
Environment and Safety
An ignition control nightmare—Protecting assets from a lightning strike
Design engineers put forth their best efforts to forecast all risks for their processing plant and strive to embed optimum controls in design, commissioning, operations and maintenance to prevent these risks during the plant’s lifecycle.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Common challenges in risk-based inspection for piping: Insights from experience
- Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
- Manage reliability and asset management performance by implementing a reliable operations committee program
Comments