July 2021
Special Focus: Plant Design, Engineering and Construction
Fix nozzle elevations and orientations for distillation columns
An engineering, procurement and construction (EPC) contractor receives a front-end engineering design (FEED) package or basic design and engineering package as an input document from the owner.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Common challenges in risk-based inspection for piping: Insights from experience
- Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
- Optimizing NGL treatment for sulfur and methanol reduction at Pembina NGL Corporation’s Redwater fractionation plant—Part 2
Comments