February 2021
Process Optimization
Optimizing for viability—VDU revamp in a brownfield project
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Common challenges in risk-based inspection for piping: Insights from experience
- Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
- Optimizing NGL treatment for sulfur and methanol reduction at Pembina NGL Corporation’s Redwater fractionation plant—Part 2
Comments