Flare header failure: An investigation
A 60-in. flare header suffered three identical failures with buckling and cracking at the circumferential weld at the bottom of the pipe. The failures are believed to have originated during hot relief..
IP: 3.17.75.138
This is a preview of our premium content. Thank you for your interest—please
log in or
subscribe to read the full article.
The Author
Tharakan, J. - Suncor Energy Inc., Calgary, Alberta, Canada
John Tharakan is a Static Equipment SME at Suncor Energy Inc.’s Enterprise Technical Department. He has a post-graduate degree in mechanical engineering design and more than 30 yr of experience in the oil industry. Mr. Tharakan renders consulting services to various business units of Suncor on complex problems involving static equipment and piping. He also leads a Suncor-wide static equipment and piping excellence network that develops best practices and proactively drives mechanical integrity. He previously worked for Kuwait Oil Co. in Kuwait and for Kochi Refineries in India.
Related Articles
From the Archive
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction
Comments