December 2007
Special Report: Plant Design and Engineering
Is modularization right for your project?
One gasoil hydrotreater case history illustrates how $12.5 million was saved
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Common challenges in risk-based inspection for piping: Insights from experience
- Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
- Optimizing NGL treatment for sulfur and methanol reduction at Pembina NGL Corporation’s Redwater fractionation plant—Part 2
Comments