Dale, C.
Caroline Dale has been working for Veolia as a biological process expert for 23 yr. Her area of expertise is MBBR for industrial applications, and she holds an MS degree in environmental engineering. Ms. Dale is based at Veolia’s headquarters in Paris, France.
Advanced biological treatment removes benzene, phenol from refinery wastewater
Historically, US regulators have not required benzene and phenol monitoring for wastewater from oil refining, petrochemical processing, coking or coal gasification operations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

