Aka, O.
Onur Aka is Process Superintendent at TÜPRAŞ headquarters, where he has held multiple positions in process and operations functions for 15 yr. Mr. Aka holds a BS degree in chemical engineering and an MBA from reputable universities in Turkey. The author can be reached at Onur.Aka@Tüpraş.com.tr
CO2 emissions reduction via a pinch study in a vacuum distillation unit
The project detailed here was carried out on a vacuum distillation unit (VDU) in the TÜPRAŞ İzmir refinery.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Shipping major and GCMD to pilot FAME-VLSFO marine biofuel bunker fuel in Singapore 5/9
- Diesel profit margins decline amid lower demand, more capacity 5/9
- World Energy and Boston Consulting Group sign agreement on SAF certificates 5/9
- Analysis: Chandra Asri purchase of Shell Singapore refinery brings scale, risk 5/9
- New $1.5-B natural gas pipeline to provide feedstock to Dow's petrochemicals plant and other industrial facilities 5/8
- Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC 5/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction