Gous, G.
Gustaf Gous works as a Process Control Consultant at Analyte Control. He graduated from the Department of Chemical Engineering, University of Pretoria, with a B-Eng degree in chemical engineering in 1987, followed by a B-Eng (Honors) and an M-Eng degree. He is now occupied with pursuing a PhD.
Integral vs. proportional gap for averaging level control
In process plants, many instances of level control are required to keep the material balance of the plant from integrating to undesired operating conditions.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EIA forecasts new export licensing requirements will reduce U.S. ethane exports 6/18
- Nigeria to export first gasoline cargo to Asia from Dangote refinery 6/18
- Indian refiners cancel palm oil orders for July-September as prices surge 6/18
- U.S. set to object to green jet fuel recommendation at UN aviation council 6/18
- Phoenix Contact introduces intrinsic safety versions of the MINI Analog Pro Ex conditioners for hazardous areas 6/18
- EIA: U.S. crude inventories fall by most in a year, fuel stocks build 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction