Hall, K. R.
Improved equations for the Standing-Katz tables
Using these calculations can predict natural gas density and improve flowrates
The design benefit method: Allocate joint costs among shared products
This accounting technique can provide more accurate results than traditional practices
Consider slotted orifice flowmeters
Accuracy can be an order of magnitude better with less permanent head loss
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- Velan releases upgrades to its delayed coker isolation valves 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

