Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- INEOS' CEO, Jim Ratcliffe, calls on European politicians to make 11th hour intervention to save Europe's chemical industry 10/9
- NTPC carbon capture project produces first drop of methanol using captured CO2 10/9
- Clariant unveils titanium-based catalyst solutions for more sustainable polyester production 10/9
- Solvay achieves near-total water independence, with Veolia’s advanced reuse technologies and tailored long-term service agreement in Brazil 10/9
- Aramco completes acquisition of additional stake in Petro Rabigh 10/9
- FourPoint Resources, Energy Transfer to facilitate expansion of Price River Terminal in Utah (U.S.) 10/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction