Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TA'ZIZ and Alpha Dhabi Holding agree to $10-B, 2.2-MMtpy of chemicals investments in the UAE 5/6
- Borouge to deliver first batch of cross-linkable polyethylene from new 100,000-tpy plant this quarter 5/6
- LyondellBasell completes sale of select European strategic assessment assets 5/6
- Australia commits $7 B to boost fuel stockpiles, create government reserve 5/6
- Israel to transfer jet fuel to Germany following Hormuz crisis 5/6
- Equinor: Iran war lifts Asia-Pacific interest for Norwegian petroleum products, LNG 5/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

