Goettler, L.
Leah Goettler is a Chemical Engineer with 4 yr of experience as a Process Engineer-in-Training at Sulphur Experts. During that time, she has been directly involved in more than 35 different sulfur recovery plant projects, with work ranging from testing and optimization to design evaluations across North America, Europe, Asia and the Eastern Mediterranean.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- TotalEnergies, EDF sign long‑term partnership for low‑carbon electricity supply for TotalEnergies’ France refining and chemicals sites 3/27
- Asia 10-ppm sulfur diesel margin hits record high 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction