Kim, S.
Evaluate the reliability of a reformer heater convection tube
The findings and analysis herein confirm that HDSS can extend material performance levels beyond existing SDSS grades, thereby reducing maintenance requirements and unplanned shutdowns for more productive and cost-effective operations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
- AMETEK Process Instruments announces additions to next-gen quartz crystal microbalance moisture analyzer line 4/16
- Brenntag Energy Services announces designated distributorship with BASF for Keropur fuel performance additives in continental Europe 4/16
- Shell restarts crude unit at Pernis oil refinery 4/16
- Nigerian airlines threaten to halt flights over soaring jet fuel prices 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

