Robling, D.
Doug Robling is the Business Development Manager for Schneider Electric’s US Services division. He has been with Schneider Electric for more than 30 yr in various engineering, operations and sales positions. Prior to Schneider Electric, Mr. Robling spent 10 yr with the Public Service Co. of Indiana, an investor-owned gas and electric utility.
Getting onboard with modernization
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Utilities
While electrical equipment typically has a lengthy lifespan, it is not meant to last, or be relevant, forever.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ABB enhances AI capabilities of flagship industrial device digital solutions 4/17
- XCF, DevvStream, Southern Energy Renewables partner to bring transferable 45Z clean fuel credits to market 4/17
- HyOrc completes independent process and technology verification for waste-to-methanol platform 4/17
- Bottled lightning makes a cleaner fuel: Research shows how bursts of plasma convert methane into methanol without high heat and pressures 4/17
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

