Robling, D.
Doug Robling is the Business Development Manager for Schneider Electric’s US Services division. He has been with Schneider Electric for more than 30 yr in various engineering, operations and sales positions. Prior to Schneider Electric, Mr. Robling spent 10 yr with the Public Service Co. of Indiana, an investor-owned gas and electric utility.
Getting onboard with modernization
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Management
/ Utilities
While electrical equipment typically has a lengthy lifespan, it is not meant to last, or be relevant, forever.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Corteva and bp launch biofuel feedstock joint venture Etlas™ 1/7
- BASF starts up 1-MMtpy ethane cracker at Verbund site in Zhanjiang, China 1/7
- Larsen & Toubro delivers first feed to HPCL's 3.55-MMtpy LC-Max residue upgrading facility 1/7
- Borouge advances industry-first AI autonomous operations at Ruwais facility 1/7
- U.S. refiners to benefit from Venezuelan crude oil imports 1/7
- Verdant Specialty Solutions completes acquisition of Lubrizol’s Elmendorf, Texas (U.S.) manufacturing and R&D assets 1/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

