Modi, R.
Implementing a suitable safety instrumented system-Part 2
The analysis is the most important step for engineering and designing a suitable system
Implementing a suitable safety instrumented system—Part 1
The "analysis phase" is the most important step for engineering and designing a suitable system
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. says there are significant undiscovered oil and gas resources in Wyoming 5/21
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
- Saudi Arabia crude exports fall to 5.754 MMbpd in March 5/21
- Low diversity in critical mineral markets could hurt industry, IEA says 5/21
- India's Russian oil imports hit 10-month high on strong demand for ESPO crude 5/21
- Akselos tackles flange failures with breakthrough SPM module 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction