Winter, G.
Gabriel Winter is an Engineering Specialist with Saudi Aramco. He has more than 20 yr of experience in the areas of process design, process simulation and optimization. In his current position at Aramco, he works with various departments and business lines to develop applications and solutions, using process simulation and optimization models. He earned a Bch degree in chemical engineering from the University of Texas at Austin.
Enhanced unit monitoring enabled by digital twin
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Information Systems
/ Loss Prevention
/ Reactors
/ Middle East
Process engineers must continuously monitor the health and performance of process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

