Subaie, E.
Eid Subaie is a Plant Operation Engineer with Saudi Aramco at the company’s Eastern region terminal operations at the Ju’aymah Tank Farm. He has 16 yr of experience in industrial operating facilities, resolving operational upsets and plant problems.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- DOMO Chemicals responds to surging demand in China with its new TECHNYL polyamide production plant 4/29
- Ineos shuts down Canadian unit for maintenance after chemical leak 4/29
- India's Chennai Petroleum sees two-year delay in building new 180,000-bpd refinery 4/29
- PetroChina profit boosted by stronger gas sales and fuel demand 4/29
- thyssenkrupp Uhde completes EnviNOx project for Dyno Nobel in Australia 4/29
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction