Subaie, E.
Eid Subaie is a Plant Operation Engineer with Saudi Aramco at the company’s Eastern region terminal operations at the Ju’aymah Tank Farm. He has 16 yr of experience in industrial operating facilities, resolving operational upsets and plant problems.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Finavia's Helsinki Airport uses Neste MY Renewable Diesel to drive operations to net-zero carbon emissions 6/9
- Honeywell drives industrial transition from automation to autonomy with new AI-enabled digital suite 6/9
- Yokogawa releases next generation of CENTUM VP integrated production control system 6/9
- Alpek will cease operations at its PET facility in North Carolina (U.S.) 6/6
- ANDRITZ to acquire Diamond Power Intl. businesses 6/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction