Subaie, E.
Eid Subaie is a Plant Operation Engineer with Saudi Aramco at the company’s Eastern region terminal operations at the Ju’aymah Tank Farm. He has 16 yr of experience in industrial operating facilities, resolving operational upsets and plant problems.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- ClassNK releases report ‘ClassNK Alternative Fuels Insight (Version 3.0): Providing new information on cost simulations reflecting approval at MEPC 83 5/22
- trinamiX and BASF showcase new technologies for polyamide 6 recycling: An approach to circularity in the textile industry 5/22
- Johnson Matthey to sell Catalyst Technologies business to Honeywell for £1.8 B 5/22
- ADNOC’s suppliers commit to invest AED3 billion in manufacturing facilities across UAE 5/22
- Hungary's MOL and MVM join forces to ship Azeri oil to central Europe 5/22
- Industrial AI: A game-changer in fast-tracking digital transformation in the energy sector 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction