Gajadhar, S.
Stephen Gajadhar is a Facilities Planning Specialist at Saudi Aramco, leading techno-economic feasibility studies and conceptual engineering of refining and chemicals projects. He is a chartered chemical engineer with 26 yr of experience in the oil and gas industry. He earned Bch and MS degrees in engineering from the University of the West Indies, St. Augustine, Trinidad & Tobago.
Advanced hydrocracking unit flow scheme optimization and integration approach to maximize refinery margins for a residue upgrading project
Environment & Safety
/ Process Optimization
/ Refining
/ Catalysts
/ Crude oil
/ Desulfurization
/ Diesel
/ Engineering & Design
/ Environment
/ Gasoline
/ Hydrotreating
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Middle East
The integration of a solvent deasphalting and hydrocracking upgrading complex provides a favorable techno-economic return for residue upgradation at relatively lower capital expenditures vs. other alternatives for a brownfield project.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Opinion: Iran war ushers in oil refining golden era—it won’t last 8/3
- bp completes sale of Gelsenkirchen refinery as overhaul continues 8/3
- Anton Paar launches Autosorb 3300: An advanced flow chemisorption analysis for catalyst characterization 7/31
- China's MIIT recognizes DODGEN melt crystallization technology for 72% energy reduction in ethylene carbonate purification 7/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

