Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Uniper, thyssenkrupp Uhde partner to build large-scale ammonia cracker in Germany 5/27
- Wood selected as project management consultancy for first major methanol plant in the UAE 5/27
- Indian refiner Reliance's April Russian oil imports up 55% m/m 5/27
- Canada shift crude oil exports to China, an unintended consequence of U.S. energy tariffs 5/27
- Libya says oil leak occurs in pipeline south of Zawiya city 5/27
- Eni in talks with GIP for sale of 49.99% of carbon capture unit 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction