Al-Ghamdi, A. S.
Abdulaziz S. Al-Ghamdi is a hydroprocessing process engineer for Saudi Aramco. He has over 12 years of experience in the petroleum refining industry and has worked in operations, engineering and projects within Saudi Armco and Aramco JV refineries. Mr. Al-Ghamdi earned a BS degree in chemical engineering from KFUPM in Saudi Arabia, and he holds an MSc degree in chemical engineering from the University of Waterloo in Canada.
Catalyst replacement strategy for a hydrocracking unit at a Middle East refinery
A Saudi Aramco refinery operates a series-flow, single-stage hydrocracking unit (HU) in a recycle high-conversion mode. The HU has been in operation for over 35 years and is being debottlenecked to increase its throughput by 20%.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe to support green ammonia flagship project in Saudi Arabia 1/27
- Asahi Kasei, Mitsui Chemicals and Mitsubishi Chemical establish entity for ethylene plant decarbonization 1/27
- Neste supports catalysis research at three universities in Finland 1/27
- Haffner Energy launches the C-iC modular units line to unlock financing for mid-sized biofuel projects 1/27
- Repsol to install second 100-MW electrolyzer at its Petronor refinery 1/27
- Toshiba and Airbus drive the future of hydrogen-powered flight with superconducting motors 1/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

