Bożek, M.
is a manager with long experience in production process management. An active participant in many investment and effectiveness programs realized in refineries, he is a former senior process engineer of the FCC and PrimeG+ unit. Mr. Bożek is the manager of the APC department and is directly responsible for the implementation and maintenance of advanced process control systems in the PKN Orlen refinery.
Utilize APC solutions to resolve hydrocracker conversion optimization challenges
Petrochemicals
/ Process Control
/ Refining
/ Diesel
/ Hydrocracking
/ Information Systems
/ Naphtha
Improving profits and reducing costs remain priorities for owner/operators and management.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 refineries to run between low to mid 90% range capacity in Q4 2024 10/29
- Sumitomo Chemical begins study to optimize operations at Keiyo Ethylene 10/29
- Refiner Phillips 66 reports 3Q profit beat on midstream, chemicals strength 10/29
- Canada's renewable diesel projects hit by U.S. import surge 10/29
- Enterprise opens new facility in Utah to expand strategic fuel storage 10/29
- Angola's Cabinda oil refinery to start up by April 10/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction