Patel, S.
Typical fired heater problems and root causes
A quick look at symptoms can provide operational answers
Canadian oil sands: Opportunities, technologies and challenges
Energy resources found at the Arctic Circle have potential
Spot energy-savings opportunities in your plant
Choosing the appropriate equipment design and other system components can improve system reliability and save money
Understand the difference between solid and serrated fins
Here are the advantages and disadvantages of each type and how to calculate their surface areas and efficiencies
Optimizing O2 levels in fired heaters
Here's the procedure this plant used to reduce fuel consumption and emissions
Simplify your thermal efficiency calculation
Standard charts and a spreadsheet help
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF supports European 1,4‑butanediol supply security through increased production in Ludwigshafen 2/16
- Vitol backs proposed $3-billion LNG power plant for South Africa's Durban port 2/16
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
- Singapore light distillates stocks hit over 3-yr high on robust imports 2/13
- Three contractors injured at ExxonMobil facility in Beaumont, Texas (U.S.) 2/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

