Montin, T.
Integrating tank farm operations
Combining a high-level expert system with the DCS increased productivity and reduced losses
Online flash point calculation improves crude unit control
An inferential control method has been developed at the AB Nynäs Petroleum refinery in Nynäshamn (Sweden). The purpose of the method is to estimate the flash points for distillates from the ..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- Velan releases upgrades to its delayed coker isolation valves 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

