Safamirzaei, M.
Mani Safamirzaei holds a PhD in chemical engineering from Amirkabir University of Technology. He is Head of the process engineering department at Namvaran P&T Co. (NPT) and has been working at the company since its establishment. Dr. Safamirzaei also teaches graduate and undergraduate chemical engineering courses at the science and research branch of IA University.
Selection of cooling water system for gas, petroleum and petrochemical plants located on coastline—Part 2
Environment & Safety
/ Gas Processing/LNG
/ Petrochemicals
/ Project Management
/ Refining
/ Environment
/ Utilities
The main options for the cooling water systems of gas, petroleum and petrochemical plants located on coastlines are studied here, and alternatives are compared with the consideration of several technical and economic parameters.
Selection of cooling water system for gas, petroleum and petrochemical plants located on coastline - Part 1
Gas Processing/LNG
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Engineering & Design
/ Equipment
/ Heat Transfer
/ Utilities
Cooling water systems play an important role in today’s industry.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- ClassNK releases report ‘ClassNK Alternative Fuels Insight (Version 3.0): Providing new information on cost simulations reflecting approval at MEPC 83 5/22
- trinamiX and BASF showcase new technologies for polyamide 6 recycling: An approach to circularity in the textile industry 5/22
- Johnson Matthey to sell Catalyst Technologies business to Honeywell for £1.8 B 5/22
- ADNOC’s suppliers commit to invest AED3 billion in manufacturing facilities across UAE 5/22
- Hungary's MOL and MVM join forces to ship Azeri oil to central Europe 5/22
- Industrial AI: A game-changer in fast-tracking digital transformation in the energy sector 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction