Abdi, M. A.
Choosing the wrong flame arrestor can prevent capacity enhancement
This Iranian gas facility debottlenecked its process and increased production
Improve contaminant control in amine systems
These guidelines illustrate what every process engineer should know about solvent contamination and loss for sour gas processing facilities
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ABB enhances AI capabilities of flagship industrial device digital solutions 4/17
- XCF, DevvStream, Southern Energy Renewables partner to bring transferable 45Z clean fuel credits to market 4/17
- HyOrc completes independent process and technology verification for waste-to-methanol platform 4/17
- Bottled lightning makes a cleaner fuel: Research shows how bursts of plasma convert methane into methanol without high heat and pressures 4/17
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

